Herunterladen Inhalt Inhalt Diese Seite drucken

Operation - Panasonic JS-950-Serie Bedienungsanleitung

Pos workstation
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 37

2. Operation

■ AC Cord Kit Installation
1. How to install the AC Cord
(1) To confirm the I/F connector on a bottom side of Main Block, lay it as shown in figure (1).
(2) Unpack the AC Cord, and then connect it to AC Inlet as shown in figure (2).
(3) Fit the Cord Clamp to AC Cord, and fix it by attached screw as shown in figure (3)-1, 2 and 3.
(4) Reawake Main Block as shown in figure (4).
(1)
(2)
(3)-1
AC Inlet
(3)-2
(3)-3
(4)
12

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis