Herunterladen Inhalt Inhalt Diese Seite drucken

Siemens Wallace & Tiernan Chem-Ad VPP Betriebsanleitung Seite 67

Schlauch-dosierpumpen
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Chem-Ad
VPP / VPP-E / VPP-DC
®
4.1.6
Mounting the peristaltic metering pump housing onto
the wall case
1 Place the peristaltic metering pump housing onto the wall case
and push into place. Make sure that no wires are trapped.
2 Screw the peristaltic metering pump housing to the wall case
with the four recessed head screws. Do not overtighten the
screws as this would damage the plastic thread.
4.1.7
Installing the capacity kit
Attention!
Never grease pump hoses!
1 Lift and remove the transparent cover.
2 Remove the blue rotor cap from the rotor.
3 Push the capacity kit into the peristaltic metering pump
housing.
4 Turn the rotor clockwise by hand and place the pump hose
into the pump track.
5 Refit the blue rotor cap on the rotor.
4.
Installation
67

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis