Herunterladen Inhalt Inhalt Diese Seite drucken

Installation - ABB C11 Installationsanleitung

Elektrizitätsmessgerät
Vorschau ausblenden Andere Handbücher für C11:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 42
EMC compatibility
Impulse voltage test
Surge voltage test
Fast trans. burst test
Immunity HF-fields
Immunity conducted
RF Emission
ESD
Standards

Installation

For information about how to mount and install the equipment, follow
the instructions in the Installation Guide at the end of this manual.
E
Warning – Working with high voltage is potentially lethal. Per-
sons subjected to high voltage may suffer cardiac arrest, burn
injuries, or other severe injuries. To avoid such injuries, make
sure to disconnect the power supply before you start the instal-
lation.
Technical Data
6 kV 1.2/50μs (IEC 60060-1)
4 kV 1.2/50μs (IEC 61000-4-5)
4 kV ( IEC 61000-4-4 )
80 MHz - 2 GHz at 10 V/m (IEC61000-4-3)
150kHz – 80MHz ( IEC 61000-4-6 )
EN 55022, class B (CISPR22)
15 kV ( IEC 61000-4-2 )
IEC 62052-11, IEC 62053-21 class 1, GB/T
17215.211-2006, GB/T 17215.321-2008
class 1 & 2, GB 4208-2008, EN 50470-1,
EN 50470-3 category B
6

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis