Herunterladen Inhalt Inhalt Diese Seite drucken

Connect A Power Source - Husqvarna PP 325 E Bedienungsanweisung

Antriebsaggregat
Vorschau ausblenden Andere Handbücher für PP 325 E:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Connect a power source

IMPORTANT! Check that the mains voltage
corresponds with that stated on the rating plate on the
machine.
Connect the incoming power cable. The cable must
have three phases and grounding. Neutral should also
be available as the single phase sockets on the
distribution box will not work otherwise. (Only on 5-pin
machines)
The single phase sockets are protected with a 16 A
residual current circuit breaker with overcurrent
protection (C type). Following the connection on
incoming current, the single phase sockets can be
used for e.g. a drilling machine, water suction
apparatus, etc.
ASSEMBLING AND ADJUSTMENTS
English
51

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis