Connecting and calibrating the dispensing pumps
A
Break out the pre-punched area in the machine rear panel; see Fig. 3.
A
Install the cable feed-through on the machine rear panel; see Fig. 3.
A
Connect the dispenser pumps in accordance with the wiring diagram.
A
If the flow rate of the dispenser pumps is known, enter the flow rate directly in the supervisor level (example:
dispenser pump 1).
A
To enter the flow rate, select the
menu.
A
Enter the flow rate in the
A
Confirm with the OK button.
A
Press the Back button to go back one level.
A
To save, confirm with the OK  button.
A
If the flow rate of the dispenser pumps is not known, calibrate the dispenser pumps in the supervisor level
(example: dispenser pump 1).
A
Supervisor level
Select the
A
Place the suction lance of the dispenser pump in a container with a fill line.
A
Fill the container to the fill line.
A
Press button 0/1 (dispenser pump runs for 60 s).
A
Use a measuring vessel to refill the container up to the fill line.
A
Determine the dispensing quantity in the measuring vessel and enter it on the display for the
value.
A
To save, confirm with the OK  button.
A
To register a container empty signal (example: dispenser pump 1), select the
Dispenser level reminder
>
A
Set the parameter value to
A
Confirm with the OK button.
A
Press the Back button to go back one level.
A
To save, confirm with the OK  button.
A
Check the dispensing in the programmes and adjust if necessary.
A
To exit the service level, switch off the machine.
A
Attach the liquid dispensing cover plate to the machine's rear panel.
Registering the water recycling (WRG)
A
Main menu
In the Service level >
set the parameter value to
A
Press the Back button 2 times to go back 2 levels.
A
To save, confirm with the OK  button.
Carrying out final work
A
Check the water connections for leaks.
A
Refit the machine lid.
A
Connect the machine to the power supply and switch it on.
A
Reconnect the machine to the gas supply if there is one and it has previously been disconnected.
A
Carry out appropriate electrical safety and functional tests.
Diese Unterlagen dürfen ohne unsere Genehmigung weder vervielfältigt noch Dritten zugänglich gemacht werden. Eigentumsrechte vorbehalten.
Supervisor level
Main menu
>
.....ml/min
parameter value.
Main menu
Settings
>
>
>
Dispenser pump 1
>
menu.
Yes
.
Service settings
>
K6
.
Umbau- und Montageanweisung
Settings
Dispensing flow rate
>
>
Dispenser calibration
Dispenser pump 1
>
Supervisor level
Basic setting
Water inlet
>
>
Dispenser pump 1:
>
menu.
V:.....ml
parameter
Main menu
>
>
Valve block 2
Water valve 3:
>
>
11 von 54
Settings
,
20.01.2022