Herunterladen Inhalt Inhalt Diese Seite drucken

Velleman VM103 Bedienungsanleitung Seite 5

Blinkmodul
Vorschau ausblenden Andere Handbücher für VM103:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

CONNECTION
Adjustment for
ON time
Adjustment
for OFF time
Fuse
AC Power
ON-TIME
OFF-TIME
FUSE
NOTE : Multiple LOADS can be hooked up in parallel. Make sure that the
max. rating is not exceeded.
All connections must be performed using solid-core wire of the
appropriate rating.
Installation must be done according to local regulations and standards.
If any doubt, consult a licensed technician.
This module is not suited for portable applications. The unit must be wall-
mounted or clicked on a DIN-rail.
When connecting inductive loads make sure that the max. rating of
200VA is not exceeded.
ON time
LD1
OFF time
LD2
OFF
FUSE
Adjust the ON/OFF time with a screwdriver
IMPORTANT !
Connection
ON-Time indicator
On
OFF-Time indicator.
Output (LOAD)
5

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis