Herunterladen Inhalt Inhalt Diese Seite drucken

Cleaning, Maintenance And Ordering Of Spare Parts; Disposal And Recycling - Parkside PSZ 250 A1 Bedienungs- Und Sicherheitshinweise

Schwenkarm fur seilhebezug
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 33
Anleitung_2255412:_
10.06.2010
the assembly work is finished, a two-part
no-load test must be performed by raising
and lowering the winch and swinging the
swing arm 180° to the left and to the right.
Then the cable winch must be
incrementally loaded up to the maximum
permissible load weight. Only when the
cable winch/swing arm assembly
successfully passes these tests may the
equipment be used for normal operation.
8. Cleaning, maintenance and
ordering of spare parts
8.1 Cleaning and maintenance
Regularly clean the swing arm and lubricate
the hinge pins (5/19).
8.2 Ordering replacement parts:
Please quote the following data when ordering
replacement parts:
Type of machine
Article number of the machine
Identification number of the machine
For our latest prices and information please go
to www.isc-gmbh.info

9. Disposal and recycling

The unit is supplied in packaging to prevent its
being damaged in transit. This packaging is
raw material and can therefore be reused or
can be returned to the raw material system.
The unit and its accessories are made of
various types of material, such as metal and
plastic. Defective components must be
disposed of as special waste. Ask your dealer
or your local council.
16:10 Uhr
Seite 11
All manuals and user guides at all-guides.com
GB
11

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis