Herunterladen Inhalt Inhalt Diese Seite drucken

Pump Down; Dry Concrete; Service Contact - Panasonic WH-UD03JE5 Serie Bedienungsanleitung

Luft/wasser-wärmepumpe
Vorschau ausblenden Andere Handbücher für WH-UD03JE5 Serie:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 344
Menus
For installer
Menu

Pump down

7.2
To set the pump down
operation.

Dry concrete

7.3
To dry the concrete (floor, walls,
etc.) during construction.
Do not use this menu for any
other purposes and in period
other than during construction

Service contact

7.4
To set up to 2 contact names
and numbers for the User.
34
Default Setting
Setting Options / Display
Pump down operation
ON
Edit to set the temperature of dry concrete.
ON / Edit
Edit
Heating temperature
for drying the
Stages: 1
concrete.
Temperature: 25 °C
Select the desired
stages: 1 ~ 10,
range: 1 ~ 99
ON
Confirm the setting temperatures of dry
concrete for each stage.
Service engineer's name and contact number.
Contact 1 / Contact 2
Contact 1 / Contact 2
Contact name or number.
Name / phone icon
Input name and number
Contact name: alphabet a ~ z.
Contact number: 1 ~ 9

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis