Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance; Probe Damage; Winterising The Probes - Davey Lifeguard DPLGEU Installations- Und Betriebsanweisungen

Komplettes poolchlorungs- & chemiekontrollsystem
Vorschau ausblenden Andere Handbücher für Lifeguard DPLGEU:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 141

11. MAINTENANCE

This section should be read in conjunction with the maintenance section of your EcoSalt2 manual
(refer www.bit.ly/EcoSalt2).

11.1 PROBE DAMAGE

Should one of the probes become damaged, the system need not be completely shut down. During the
time it takes to replace the damaged probe(s), simply use the probe blanks in place. This will allow the
continued circulation and filtration of your pool water. To fit the probe blanks refer Section 4.4.
IMPORTANT: Be sure to turn off the probe in the Lifeguard menu, following the
relevant part from section 8.
When re-fitting the replacement probe, following the relevant part from Section 6.

11.2 WINTERISING THE PROBES

When winterising the pool, if the pool equipment is to be completely switched off, Davey recommends the
probes be unplumbed from the pipework and stored in a "winterising solution". The original probe bottles
may be used. Alternatively, the ORP and pH probes may be winterised in a 3M-3,5M KCl solution while
the salt/conductivity probe may be stored in distilled water.
64
▲ CONTENTS

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Lifeguard dclgau

Inhaltsverzeichnis