Herunterladen Inhalt Inhalt Diese Seite drucken

Initial Start-Up Of The Timer - Steinbach Comfort 50 Bedienungsanleitung

Vorschau ausblenden Andere Handbücher für Comfort 50:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1
3. Insert the vessel seal
foreign objects in the groove and for
the correct fit of the seal.
4. Align the notch on the outer edge of
the valve head
lug of the filter vessel.
5. Place the valve head on the filter
vessel.
6. Place the locking ring
valve head and filter vessel connecting
point.
7. Insert the locking ring bolt
hexagon socket of the locking ring.
8. Pass the locking ring bolt through the hole on the opposite side of the clamping ring.
9. Place the wing nut
The filter vessel is prepared.

Initial start-up of the timer

The timer is going to function flawlessly even if you do not perform the steps
described below. However, should the power supply be interrupted, the
saved filter running times will be lost.
1. Make sure that the pump's power
cable is disconnected from the power
supply.
2. Use a Phillips PH1 screwdriver to
remove the screws of the timer cover
(turn counterclockwise).
3. Remove the cover.
4. Pull out the strip of plastic from
underneath the battery.
5. Replace the cover.
6. Screw in the screws clockwise.
54
. Check for any
3
with the adjustment
1
around the
2
into the
4
onto the thread and turn it clockwise to tighten it.
5
4
5
2
4
6
3
5
1

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis

Fehlerbehebung

loading

Diese Anleitung auch für:

Comfort 75

Inhaltsverzeichnis