Herunterladen Inhalt Inhalt Diese Seite drucken

Wall Mounted Charger; Cleaning; Maintenance; Disposal And Protection Of The Environment - Parkside PLGK 12 V A2 Originalbetriebsanleitung

Akku 2 ah + ladegerät
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 4
• The storage temperature for
the battery is between 0 °C
and 45 °C. Avoid extreme
cold or heat during storage
to ensure the battery output
is not adversely affected.

Wall mounted charger

(optional)
You can also mount the charger
(3) on the wall.
• Using dowels, place two
screws 54 mm apart at the
desired position of a wall.
• The screw head can have a
diameter of 7 - 9 mm
• Leave the screw heads pro-
truding at a distance of ap-
prox. 10 mm from the wall.
• With the openings of the
wall bracket, you can attach
the charger (3) to the two
screws and pull the charger
down until it stops.
When drilling, be
careful not to dam-
age any supply
lines. Use suitable
search devices to
find these or consult
an in-stallation plan
for guidance. Con-
tact with electrical
cables can lead to
electric shock and
fire. Contact with a
gas pipe can result
in an explosion.
Damage to a water
pipe can lead to
property damage
and electric shock.

Cleaning

Clean the charger and the bat-
tery with a dry cloth or with a
paint brush. Do not use water
or metal objects.

Maintenance

The appliance cleaner is main-
tenance free.
Disposal and protec-
tion of the environ-
ment
Remove the battery from the
device and take the device,
battery, accessories and
packaging for environmentally
friendly recycling.
Machines do not belong
with domestic waste.
GB
IE
31

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Papk 12 v a2Papk 12 a2Plgk 12 a2Ian 338159_2001

Inhaltsverzeichnis