Mounting of the front rack
• Hold the front rack over the head tube, aligning the four connection
points with the drillings in the tube (fig. 4).
EN
• Pay attention to the cables passing through the left metal sheet (in
direction of travel) and the head tube.
• Turn the bottom screws about half way in to secure the rack.
• Place the provided shim between the metal of the rack and the top
drilling of the head tube (fig. 5) and turn in the top screw.
• Now you can tighten all 4 screws with 15 Nm (fig 6).
Disassembly works in reverse order.
5
30
4
6