Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly And Installation - Canon RS-CL07 Installationsanleitung

Deckenmontagehalterung
Vorschau ausblenden Andere Handbücher für RS-CL07:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 50

Assembly and Installation

Installation to flat and level Ceiling
Preparation:
Separate the Joint fitting from the
Ceiling-mount bracket temporarily
Remove four M5 screws to separate Joint
fitting from the Ceiling-mount bracket.
1
Make a hole in the ceiling
Make a hole in the ceiling to install the
Ceiling-mount bracket and cables.
● When determining the hole position, use the
supplied template sheet.
● The direction to the screen is indicated on the
template sheet.
2
Secure the Ceiling-mount bracket to
the ceiling
Use four M13 screws, to secure the Ceiling-
mount bracket to the ceiling with the arrow
facing toward the screen.
● Before securing the Ceiling-mount bracket, be
sure to remove the template sheet.
● The M13 screws are not included in the supplied
parts. Prepare the M13 screws suitable for the
ceiling structure.
3
Attach the Base bracket to the
projector
Secure with the supplied M4 screws (RS-
CL07: 6 pcs.; RS-CL10: 5 pcs.).
WUX10 MarkII/SX7 MarkII/SX60/X700
SX80 MarkII/SX800
Direction to the
screen
Direction to the
screen


Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Rs-cl10

Inhaltsverzeichnis