Herunterladen Inhalt Inhalt Diese Seite drucken

Assembly; Before First Use - Parkside PSZ 250 A1 Bedienungs- Und Sicherheitshinweise

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 58
Do not operate the product if the power
¾
cord or power plug are damaged, nor if the
product does not work or is damaged in any
way .
If the power cord is damaged, it must be
¾
replaced by the manufacturer, its service
agent or similarly qualified persons in order
to avoid a hazard .
Do not disconnect the power plug from the
¾
socket outlet by pulling on the power cord .
Special safety information for rope
hoists
Persons who intend to use the product
¾
must first receive appropriate training or
instructions .
It is prohibited to move persons with the
¾
product .
It is prohibited to lift loads in excess of the
¾
nominal load .
Do not attempt to lift stuck or jammed loads .
¾
The steel cable must be taut when lifting the
¾
load .
Do not pull the loads in horizontal direction .
¾
Avoid switching the product on and off
¾
rapidly (inching operation) .
Always be attentive when operating the
¾
product .
Do not leave hanging loads unattended
¾
without taking appropriate safety measures .
Do not stand or work underneath raised
¾
loads .
The product has not been outfitted with a
¾
rated power limit . Do not attempt to lift the
load further when the overheat protection
limits operation . In this case, the load has
exceeded the product's nominal power .
Do not use the maximum/minimum length
¾
levers 15 16 routinely as a stop mechanism .
These levers serve as a stop mechanism only
in emergencies .
Before you begin: Check whether
¾
the steel cable 14 is wound properly
around the drum 17 and whether
the space between coils is less than the
diameter of the cable itself (Fig . D) .
˜ Assembly
(Fig . E)
m
DANGER!
The square tube must be able to bear
u
a minimum load of 500 kg at the
points where the product is fastened . If
you are unsure, consult a professional
(e .g . a structural engineer) .
Seek advice from a qualified technician to
u
ensure all screws are tightened fully and
correctly .
A qualified technician or a properly
u
trained person should check the anchoring
of the square tube before the product is
started .
Fasten the product with the mounting
¾
brackets 1 and the mounting screws 2 to
a suitable square tube .
Tighten the mounting screws 2 .
¾
˜ Before first use
Remove the transport lock from the steel
¾
cable 14 . Cut the rubber band and remove
it .
GB/CY
9

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis