2 - SETTING THE PUMP
For models ZEM 2-13C and ZEM 2-17C, the pump must be set to PP2 using the button (10).
10
3 - DISCHARGE PRESSURE
ZEM 2-13C & ZEM 2-17C with ALPHA2 L 15-50
Note: It is advisable to set the pump to speed III for a few minutes to evacuate air bubbles from the
installation. Set the pump to PP2 again when this operation has been completed.
Do not set the pump to speed I or PP1 (insufficient flow).
Page 11 of 12