Herunterladen Diese Seite drucken
Panasonic CZ-CWEBC2 Installations- Und Kundendiensthinweise
Vorschau ausblenden Andere Handbücher für CZ-CWEBC2:

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 3
Installation (Electric) and Service Instructions
Safety Precautions
Before conducting installation or electrical work, be sure to carefully read these "Safety Precautions" and
follow them carefully.
The precautions given in this manual consist of specific "Warnings" and "Cautions". Be sure to follow these
precautions, as they provide important safety related information. The labels and their meanings are as
described below.
Warning
This refers to a hazard or unsafe procedure or practice which can result in severe personal
injury or death.
Caution
This refers to a hazard or unsafe procedure or practice which can result in personal injury or
product or property damage.
● Be sure to arrange installation at the dealer where the system was purchased or use a professional installer. Electric
shock or fire may result if an inexperienced person performs any installation or wiring procedures incorrectly.
● Carefully follow these Installation (Electric) and Service Instructions when installing the unit. Electric shock or fire may
result if the unit is not installed correctly.
● Electrical installation should be performed by qualified electrician, in accordance with the provisions of the Technical
Standards for Electrical Installations, local regulations for indoor wiring, and these Installation (Electric) and Service
Instructions. Be sure to use a dedicated electrical circuit. Insufficient electrical circuit capacity may result in electric
shock or fire.
● Use the specified cables for the electrical connections, and connect the cables securely. Fasten the cables securely so
that the cables will not exert force on the connection terminals. Insecure connections or fastening may result in
overheating or fire.
● The installation location may require the use of a circuit breaker. Failure to use a circuit breaker may result in electric
shock or fire.
● Install this unit to the location where general users cannot easily access (such as inside the control box).
● When performing electrical installation, discharge any accumulated static electricity to ground before touching the unit.
● Always use the system together with a remote controller or a system controller.
Supplied parts
Part
Part
Part name
Quantity
Part name
number
number
Small
pan
4
Nut(M4)
head bolt
(M4 x 10)
Flat
4
Cable tie
washer
Operation
This
1
Manual
leaflet
Cable tie (for fixing
Ferrite core
a ferrite core)
1
Wiring
3
Always shut off the power supply (breaker) before installing or uninstalling.
(1) Power supply connection
Connection terminals
Connect the power supply to the commercial
power mains (100 to 240 V AC), using a dedicated
circuit. Connect the power supply lines to the L and
N power supply terminals (the power supply
neutral to the N terminal).
Connect an earth ground line to the power
Power
supply terminal.
supply
terminals
Firmly secure the power lines using the supplied
cable tie.
(2) Signal connection
Power switch
● Do not run signal lines through the same
conduit as power supply lines, use the same
cable as the power supply, or run close to the
power supply lines (maintain at least 30 cm
separation, if cabled outside the control box).
● Do not run the LINK1 and LAN signal lines
through the same conduit, or run the signal lines
close together.
● Connect indoor and outdoor signals using 0.5 -
2.0 mm² two-conductor cable.
Inter-unit
Overall length of each signal line should be 1
control
wire
km or less.
terminals
Secure the shielded cable to the metal plate with
a screw, as illustrated (apply one-line
grounding).
● Use LAN cables of Category 5 or higher.
● Be sure to attach the supplied ferrite core at one
end of the LAN cable (Web Interface side). Use a
cable tie to make sure the ferrite core stays in place.
Basic wiring diagram
Wire up the Inter-unit control wire as shown in the figure below.
Web Interface
LAN
Inter-unit control wire
PC
(CZ-CWEBC2)
Warning
Caution
Specifications
Rated voltage .................... 100 - 240 V ~, single phase
Quantity
Rated frequency .............. 50/60 Hz
Power consumption .......... 17 W max.
Operating temperature ..... 5 to 40° C
4
Operating humidity ........... 20 to 80%
(non-condensing)
2
1
1
1
Cable tie
Power
supply
line
In ter-unit
control wires
Cable tie
Use this screw when connecting the shield
for the Inter-unit control wiring to ground.
LAN cable
Wiring procedure
● Inter-unit control wire (no polarity)
Use the shielded wire for inter-unit control wiring.
Connect signal terminals 0 and 1 (LINK1) to the
inter-unit control wire terminals of an indoor or
outdoor unit.
Make sure that power lines are not connected to the
inter-unit control wire terminals.
* If the power voltage is accidentally applied to the
inter-unit control wire terminals, the fuse will go
out to protect the board, but not in some cases.If this
happens, disconnect the power line, and connect
the inter-unit control wire to the spare U2 terminal.
(The other signal line can stay connected to the U1
terminal.) The spare U2 terminals are right next to
the main U2 terminals.
Use terminal 2 (LINK1-U2) instead of terminal 1
● LAN cable
Connect the LAN cable directly to the PC or to the
network hub.
3
Cautions regarding the design of the control box
1
External dimensions
80
185
Take the following into consideration when designing the control box:
(1) To ensure sufficient airflow for cooling, provide air vents (holes, slots, etc.) on
the upper, lower, left and right sides of the box, as shown in the figure below.
(Be sure not to clog the ventilation hole when setting.)Ensure that the
temperature inside the control box does not exceed 40°C.
Control box example
100
100
mm min.
mm min.
50
mm min.
control box (interior)
air vents (bottom)
Mounting
2
Caution
● Mount the unit far away from potential noise sources.
● Do not mount the unit where it could get wet, or in
areas of high humidity.
● Do not mount the unit where it could be subject to
excessive vibration or shocks.
● Mount the unit inside a control box.
(1) Remove the tapping screw at the side of the LAN
connector and open the lid.
(2) Mount the controller unit to the control box using
the four supplied bolts, washers, and nuts.
(3) Replace the lid, and secure it with the tapping screw.
System power off procedure
4
(1) Press and hold
swich for more than 4 seconds.
DOWN
The 7-segment LED indication appears as below.
Wait several minutes.
The 7-segment LED indication appears as below.
(2) Turn the power switch off.
Verify the system configuration, make necessary settings
5
(1) Turn on power to all air conditioner units.
(2) Turn on power to the unit.
(3) Set the date and time on the unit and verify the system configuration.
(4) Verify the number of units connected.
(5) Perform the necessary settings. Be sure to set the central control address.
* See the Operation Manual for details.
Educating the customer
6
● Give the Operation Manual to the customer.
● Explain the operation to the customer, following the explanations given in the Operation Manual.
EN
Control box machining diagram
(bolt hole pitch)
(bolt hole pitch)
75
75
bolt hole diameter
5
bolt hole diameter
5
* It is possible to install the unit upside down.
(2) Keep the power and communications signal
lines as far apart as possible (at least 50 mm,
if cabled inside the control box) to reduce the
effects of electrical noise.
Wiring example
air vents (side)
Power line (including ground)
100 mm min.
Communications
Signal lines
Keeps as far away
as possible
(at least 50mm)
100 mm min.
air vents (side)
Mounting diagram
Nuts M4 (four)
Flat washers (four)
Φ4 Tapping screw
(one)
Pan-head bolts
M4 x 10 (four)
2
7-segment LED
S6
D1
S7
S8
S9
HOME
D2
UP DOWN SET
DOWN switch
85464369358010-1
Printed in Japan
4

Werbung

loading

Inhaltszusammenfassung für Panasonic CZ-CWEBC2

  • Seite 1 Installation (Electric) and Service Instructions (CZ-CWEBC2) Safety Precautions Cautions regarding the design of the control box Before conducting installation or electrical work, be sure to carefully read these “Safety Precautions” and External dimensions Control box machining diagram follow them carefully.
  • Seite 2: Spécifications

    Instructions d'installation (électrique) et de service (CZ-CWEBC2) Consignes de sécurité Avertissements à propos de la conception du boîtier de commande Avant d'effectuer des travaux d'installation ou d'électricité, assurez-vous de lire attentivement ces Dimensions extérieures Gabarit du boîtier de commande "Consignes de sécurité" et de les respecter scrupuleusement.
  • Seite 3 (Elektro-) Installations- und Kundendiensthinweise (CZ-CWEBC2) Wichtige Sicherheitshinweise Vorsichtmaßregeln in Bezug auf den Entwurf des Kontrollkastens Lesen Sie vor der Inbetriebnahme des Systems unbedingt diesen Abschnitt „Wichtige Sicherheitshinweise“ Externe Abmessungen Kontrollkasten Verarbeitungs-Diagramm und befolgen Sie diese strengstens. Die in dieser Anleitung dargestellten Sicherheitsanweisungen bestehen aus besonderen „Warnungen“ und...
  • Seite 4 Istruzioni per l'installazione (elettrica) e la riparazione (CZ-CWEBC2) Precauzioni di sicurezza Precauzioni sulla progettazione dell'armadio di controllo Prima di procedure con l'installazione o lavori elettrici, assicurarsi di leggere attentamente queste Dimensioni esterne Diagramma di lavorazione armadio di controllo "Precauzioni di sicurezza" e seguirle con attenzione.
  • Seite 5 Instalação (Eléctrica) e instruções de serviço (CZ-CWEBC2) Cuidados de segurança Cuidados a ter relativamente ao modelo da caixa de comando Antes de efectuar a instalação ou serviços eléctricos, leia atentamente estes "Cuidados de segurança", Dimensões externas Diagrama dimensional da caixa de comando observando-os na íntegra.
  • Seite 6: Especificaciones

    Instrucciones de instalación (eléctrica) y puesta en servicio (CZ-CWEBC2) Precauciones de seguridad Precauciones sobre el diseño de la caja de control Antes de realizar la instalación o trabajo eléctrico, lea estas “Precauciones de seguridad" y sígalas Dimensiones externas Mecanizado - caja de control atentamente.