Herunterladen Inhalt Inhalt Diese Seite drucken

Maintenance Schedule - Parkside PSE 2800 A1 Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für PSE 2800 A1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 75
Anleitung_4152412_LB4:_

11. Maintenance schedule

Please adhere to the following maintenance periods in order to ensure a failure-free operation.
Important. The equipment must be filled with engine oil and fuel before it is started.
Before each
use
Checking the
engine oil
Changing the
engine oil
Checking the air
filter
Cleaning the air
filter
Cleaning the
petrol filter
Visual inspection
of the equipment
Cleaning the
spark plug
Checking and
readjusting the
throttle vale on
the carburetor
Cleaning the
cylinder head
Set the valve play
Important: The positions marked with "x*" should only be carried out by an authorized dealer.
26.10.2011
16:18 Uhr
After an
After an
operating
operating
period of 20
period of 50
hours
hours
x
For the first
time, then
every 50
hours
x
x
Distance: 0.6
mm, replace if
necessary
Seite 15
After an
After an
operating
operating
period of 100
period of 300
hours
hours
x
Change the
filter insert if
necessary
x
x
GB
x*
x*
x*
15

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis