Herunterladen Inhalt Inhalt Diese Seite drucken

Before Starting The Equipment; Assembly; Electrical Safety; Environmental Protection - Parkside PSE 2800 B2 Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 53
Safety Information / Before starting the equipment / Operation
Consumption at 2/3 load: approx. 1.36 l/h
Weight:
LpA sound pressure level:
Uncertainty K:
LWA sound power level
K uncertainty:
Power factor cos ϕ:
Power class:
Max. temperature:
Max. altitude (above
mean sea level):
Spark plug:
operating mode S1 (continuous operation)
The equipment can be continuously operated with
the quoted power output.
operating mode S2 (temporary operation)
The equipment may be temporarily operated with
the quoted power output 2 min.

Before starting the equipment

Assembly

the installation of the equipment requires
two open-ended wrenches (size 12).
A ssemble all parts before filling in fuel and oil
in order to prevent the fluids from leaking out.
A ssemble the foot
, wheels
16
bar
as shown in Figures E - H.
18
T o mount the wheels, first slide the axle
through the mountings on the bottom of the
generator and fit the wheels
Figure F.
42 kg
J
74,2 dB(A)
2 dB(A)
J
96 dB(A)
2,3 dB(A)
J
1
J
G1
40°C
1,000 m
LD F6TC
and push
(approx. 0.6 l) and fuel before you can start the
14
engine.
15
as shown on
14

Electrical safety

E lectric supply cables and connected equipment
must be in perfect condition.
T he generator is to be operated only with
equipment whose voltage specifications conform
to the generator's output voltage.
N ever connect the generator to the power
supply (socket-outlet).
K eep the cable length to the consumer as short
as possible.

Environmental protection

D ispose of soiled maintenance material and
operating materials at the appropriate collection
point.
R ecycle packaging material, metal and plastics.

Connecting to earth

The housing must be connected to earth in
order to discharge static electricity. To do this,
connect one end of a cable to the earth con-
nection
on the generator (Fig. B) and the
4
other end to an external earth.

operation

IMPortAnt! You must fill up with engine oil
Check the fuel level and engine oil level, refill if
necessary by topping up the oil though the oil
filler screw
and the petrol through the petrol
7
filler cap
.
2
M ake sure that the generator has sufficient
ventilation.
M ake sure that the ignition cable is secured to
the spark plug.
I nspect the immediate vicinity of the generator.
D isconnect any electrical equipment which
may already be connected to the generator.
GB/MT
45

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis