Herunterladen Inhalt Inhalt Diese Seite drucken

Insertion / Removal Of A Battery Pack Into The Appliance; Checking Battery Status; Changing Tools; Torque Pre-Selection - Parkside PABS 18 A1 Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für PABS 18 A1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

J
never charge the battery pack if the ambient
temperature is less than 10 °C or greater than
40 °C.
1. Insert the battery pack
charger
(see fig. C).
10
2. Insert the power plug into the socket. The now
glowing red charging control LED
that the charging process has begun. The red
charging control LED
as the battery pack is fully charged.
3. The green charging control LED
you that the charging process is complete and
the battery pack
7
J
never charge the battery pack for a second time
immediately after a fast charging process has
been completed. This can give rise to the battery
pack becoming overcharged and to a reduced
service life of the battery and charging station.
j
Switch the charger off for at least 15 minutes
between two successive charging procedures.
Remove the power plug from the wall socket.
Insertion / removal of a battery
Q
pack into the appliance
Ensure that the appliance is switched off before in-
serting the battery. The insertion of a battery into an
electrical appliance that is switched on can lead to
accidents.
Inserting the battery pack:
j
Bring the rotation direction switch
middle position (Locked) and insert the battery
pack
into the handle until it engages.
7
removing the rechargeable battery pack:
j
Press the release button
rechargeable battery pack

Checking battery status

Q
j
To check the battery status, press the battery
LED button
(refer to main diagram). The sta-
2
tus or residual capacity will be indicated in the
battery LED
as follows:
2
into the quick-
7
indicates
12
extinguishes as soon
12
signals to
11
is ready for service.
into the
3
and remove the
6
GREEn / RED / ORAnGE = maximum charge /
capacity
RED / ORAnGE = medium charge / capacity
RED = weak charge – recharge battery

Changing tools

Q
Your cordless electric drill / screwdriver has a fully
automatic spindle lock
enclosed keyless chuck incorporating the latest
technology from
Once the motor has come to a halt, the drive shaft
is automatically locked, so that the chuck
be opened simply by turning it
After you have inserted the required bit and fixed it
in place by turning the chuck
ately continue working. The spindle lock releases
itself automatically when the motor is started (by
operation of the On / Off switch

Torque pre-selection

Q
You can adjust the torque by using
selection. The torque levels regulate a range of up
to ca. 8 nm.
j
Select a low setting for small screws, soft work
material.
j
Select a high setting for large screws, hard
work materials and for the extraction of screws.
j
for drilling, push the selector to the setting for
drilling, in that you adjust the torque pre-selector
to the position .
j
for drilling tasks, also push the gear selector
switch
to the front (Position: 2).
1

2 Gear Drive

Q
CAUTION! Move the gear selector switch
only after the device has come to a standstill.
failure to observe this advice may result in damage
to the device.
Before first use
and is fitted with an
"Made in Germany".
can
9
.
, you can immedi-
).
4
torque pre-
8
GB/IE
1
11

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis