Herunterladen Inhalt Inhalt Diese Seite drucken

Filter Unit; Condensate Drain Via The Drain Valve; Oil Mister Unit - Parkside PDWE 8 A2 Originalbetriebsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 63
gauge display
4
Lock the setting by pressing the com-
pressed air controller
Note:
Ensure that the maximum possible
operating pressure of the mainte-
nance unit and the pneumatic tool is
not exceeded.
z Filter unit
The filter unit
is linked to the pressure con-
1
troller
. The maximum working pressure
3
is 8 bar and the operating pressure can be
adjusted from 0.5 to 8 bar. The filter unit
is used to filter condensate and stores the
condensate in the filter tank
You can check the condensate fill level
through the transparent sight windows (see
Fig. C). The stored condensate can be
drained via the drain valve
z Condensate drain via the
drain valve
Ensure horizontal installation of the main-
tenance unit so that the condensate can be
stored horizontally in the tank
The filter unit
must not be used without the
1
tank
installed.
13
Use a matching tank in order to drain the
stored condensate from the tank
against the drain valve
(see Fig. G), this causes it to open and
thus, the condensate flows into the
container.
.
downwards.
3
.
13
.
12
as well.
13
. Press
13
from below
12
G
z Oil mister unit
The oil mister unit

filter unit

. It has the function of oiling the
1
filtered compressed air that is transported
1
towards the compressed air tool.
You can check the fill level of the oil tank
(integrated into the oil mister unit) through
the transparent sight windows. Use only
matching oil for this maintenance unit (see
above).
Turn the oil drain screw
stalled on the sight glass clockwise ("–"),
in order to reduce the required volume
of oil. Turn it counter-clockwise ("+") to
increase the volume of oil.
The integrated sight window permits
continuous overview of the filtered com-
pressed air.
To top up oil, turn the screw
with a suitable socket wrench. Fill the
tank with a matching hopper and tighten
the screw again with the wrench.
Starting up
is connected to the
9
that is in-
7
down
6
GB
11
11

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis