Herunterladen Inhalt Inhalt Diese Seite drucken

Before Using; Mounting; Setting Up The Pulley Function; Operation - Parkside PSZ 250 B2 Bedienungs- Und Sicherheitshinweise

Seilhebezug
Vorschau ausblenden Andere Handbücher für PSZ 250 B2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Safety notices specific to the device / Before using / Operation
Before beginning, verify the steel cable
wound around the drum
clearance between the turns is smaller than the
steel cable (Fig. B).

Before using

Mounting (see Fig. C)
Secure the cable hoist to a square pipe / boom
using the 2 mounting brackets
ons of the square pipe / boom must correspond
with the size of the mounting bracket
must be able to bear double the rated load.
Note: We recommend contact a qualified
technician for this purpose.
Screw the mounting brackets
hoist (also see Fig. C).
Tighten all screws.
Note: A qualified technician should inspect
the anchor of the square tube / boom before
putting the device into service.
Note: The cable hoist motor
with a thermostat switch. The motor
fore stop whilst operating the cable hoist; it will
automatically restart once it has cooled down.

Setting up the pulley function

(see Fig. D–G)
The cable hoist is equipped with a pulley
an additional hook
16
cable hoist can lift double the load.
Install the pulley
as shown in figures D–G.
Hook the fixed hook
(see Fig. G). The load will now be lifted with
2
two steel cables and the cable hoist can there-
fore lift double the load.
16 GB/MT
100684_par_Seilhebelzug_content_IT.indd 16
is
6
correctly and the
3
. The dimensi-
1
and
1
to the cable
1
is equipped
14
may there-
14
and
15
. When used correctly, the
and additional hook
15
16
into the fixing opening
8

Operation

Putting the cable hoist
into service
The user must hoist the load from the ground at
the slowest possible speed. The cable must be
tightened when the load is being hoisted.
Secure the device with a 10 A fuse or a 10 A
earth leakage circuit breaker to protect the
electric circuit.
Before beginning, verify the steel cable
wound around the drum
clearance between the turns is smaller than the
steel cable (Fig. B).
Remove the adhesive tape from the cable drum
prior to first use.
3
Ensure the load is properly secured to the hook
or, for pulley operation, the additional hook
8
, and always maintain a distance to the
16
load and the steel cable

Operating the cable hoist

Check if the emergency stop switch
pressed.
Turn the emergency stop switch
to release.
Press the push button ▲
(see Fig. H).
Press the push button ▼
(see Fig. H).
Auto-stop mechanism lever
When the maximum hoisting height has been reached,
the shut-off weight
will push the lever
7
This engages a limit switch and the load can no
longer be hoisted.
Maximum cable length lever
When the load reaches the lowest possible position,
an end switch is activated, preventing the load from
being lowered further. This end switch also prevents
the cable hoist from being operated in the wrong
direction (hook moving opposite of the direction
indicated on the push button
is
6
correctly and the
3
.
6
is
9
clockwise
9
to hoist the load
10
to lower the load
10
5
upward.
5
4
).
10
02.07.14 12:41

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis