Herunterladen Inhalt Inhalt Diese Seite drucken
Inhaltsverzeichnis

Werbung

10 WINTERIZATION – DRAINING
In areas where frost is likely in winter after the irrigation season, the machine must be drained in time. A
compressor with a minimum air capacity of 500 l/min. at 1 bar overpressure is best suited for this purpose. The
small amount of water remaining in the PE-pipe after the draining will not do any harm.
Turn out the drain plug on the bottom of the TI 7 turbine. We recommend to turn it in again only when you start
up the machine again at the beginning of the next season. Clean the Smart RAIN and regrease all appropriate
points. The machine should preferably be stored in a roofed shelter where it is protected from direct exposure to
the weather.
22
Red plug with ventilation mounted on top
Filling screw for gear oil ( 0,9 liters )
Drain screw for gear oil
Grease the jack.
Grease the support.
Betriebsanleitung für Smart RAIN

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis