Herunterladen Inhalt Inhalt Diese Seite drucken

Before Starting The Machine; General Information - Parkside PDKS 120 A2 Bedienungs- Und Sicherheitshinweise

Dekupiersäge
Vorschau ausblenden Andere Handbücher für PDKS 120 A2:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

Anleitung_LB3_4309023:_
Operating mode S2 20 min:
Rated operating period 20 min / rated idle
period 20 min
A load factor of S2 20 min (intermittent periodic
duty) means that you may operate the motor
continuously at its nominal power level 80 W for
no longer than the time stipulated on the
specifications label (20 min). If you fail to
observe this time limit the motor will overheat.
During the OFF period the motor will cool again
to its starting temperature.
Noise emission values
Sound and vibration
Sound and vibration values were measured in
accordance with EN 61029.
Wear ear-muffs.
The impact of noise can cause damage to
hearing.
Sound pressure level L
: 82.6 dB
pA
Uncertainty K
:
pA
Sound power level L
:
WA
Uncertainty K
:
WA
The quoted values are emission values and not
necessarily reliable workplace values. Although
there is a correlation between emission and
immission levels it is impossible to draw any
certain conclusions as to the need for additional
precautions. Factors with a potential influence
on the actual immission level at the workplace
include the duration of impact, the type of room,
and other sources of noise etc., e.g. the number
of machines and other neighboring operations.
Reliable workplace values may also vary from
country to country. With this information the
user should at least be able to make a better
assessment of the dangers and risks involved.
25.05.2011
13:48 Uhr
Seite 13
Reduce noise generation and vibration to a
minimum!
Use only equipment that is in perfect condition.
Maintain and clean the equipment regularly.
Adopt your way of working to the equipment.
Do not overload the equipment.
Have the equipment checked if necessary.
Switch off the equipment when not in use.

7. Before starting the machine

Important.
Always pull out the power plug before
making adjustments to the equipment.

7.1 General information

All covers and safety devices have to be
properly fitted before the equipment is
switched on.
It must be possible for the blade to run
freely.
When working with wood that has been
Mode
Idle
processed before, watch out for foreign
bodies such as nails or screws, etc.
62.3 dB
Before you actuate the On/Off switch, make
3 dB
sure that the saw blade is correctly fitted
95.6 dB
75.3 dB
and that the equipment's moving parts run
smoothly.
3 dB
Check that the voltage on the rating plate is
the same as your supply voltage before you
connect the equipment to the power supply.
Only ever connect the equipment to a
properly installed shock-proof socket which
is protected by a 10A fuse as a minimum.
7.2 Installing the fretsaw on a workbench
(Fig. 3, 4)
The unit may only be installed by a
professional.
Required for installing (not provided):
M8 hex screw (4x)
M8 hex nut (8x)
Washer, Ø 8 mm (4x)
Flat gasket, Ø 8 mm (4x)
Rubber base: 450 x 250 x 13 mm
GB/
IE
13

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis