Herunterladen Inhalt Inhalt Diese Seite drucken

Use As A Solid Fuel Lighter / Use Of The Grill Lighter Nozzle; Electrical Safety; Initial Start-Up; Operation - Parkside PHLG 2000 D3 Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für PHLG 2000 D3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Use as a solid fuel lighter /
use of the grill lighter
nozzle (8)
• Check that the solid fuel lighter
is in the correct position.
• Isolate from the mains before
removing it from the fire.
• Allow the solid fuel lighter to
cool down before packing it
away.
• The connection cable or other
flammable materials must not
come into contact with the hot
parts of the solid fuel lighter.
Caution: This is how to avoid
accidents and injuries by an
electric shock:

Electrical safety

• Make sure that the mains vol-
tage matches the details on the
type plate.
• Connect the device only to a
socket with a residual current
circuit breaker (RCCB) with a
tripping current of not more
than 30 mA.
• Do not use the mains cable to
pull the plug from the socket.
Protect the mains cable from
heat, oil and sharp edges.
• Switch the device off and pull
the mains plug out of the socket
if the mains cable is damaged.
If the connection cable of this
device is damaged, it must be
replaced by the manufacturer
or their customer service or by
a similarly qualified person in
order to avoid hazards.
• Do not connect a damaged
mains cable to the power sup-
ply. Do not touch a damaged
mains cable as long as it is
connected to the power supply.
A damaged mains cable can
result in voltage-carrying parts
being touched.

Initial start-up

When used for the first time, some smoke
may escape. The smoke is caused by bin-
ders which are removed from the insulating
film of the heater by the heat during first
use. To ensure that the smoke escapes quic-
kly, the device should be placed on the
stand area. Be sure to ventilate the wor-
king environment during first use.
If the smoke/odour is too strong, move the
initial start-up to outside!

Operation

Switching ON and OFF

Change the step switch (2) to level "I". The
device reaches an air quantity of 300 l /
min at 350 ° C.
Change the step switch (2) to level "II". The
device reaches an air quantity of 500 l /
min at 550 ° C.
Change the step switch to level "0" to
switch it off.
GB
IE
NI
7

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis