Herunterladen Inhalt Inhalt Diese Seite drucken

Yamaha TT-R125LW(M) Wartung Und Service Seite 280

Inhaltsverzeichnis

Werbung

CLUTCH AND PRIMARY DRIVEN GEAR
9. Adjust:
Push lever position
Adjustment steps:
Loosen the locknut 1.
Turn the push rod 1 2 clockwise or coun-
terclockwise to match alignment marks.
Hold the push rod 1 to prevent it from
moving and tighten the locknut to specifi-
cation.
Tighten the locknut 1.
Locknut:
8 Nm (0.8 m • kg, 5.8 ft • lb)
10. Install:
Dowel pins
Gasket (right crankcase cover)
Right crankcase cover
Bolts (right crankcase cover)
NOTE:
Apply Quick gasket
1215) to end of the right crankcase cover
bolts, as shown.
Tighten the bolts in stages, using a criss-
cross pattern.
Quick gasket
ACC-QUICK-GS-KT
Yamaha bond No. 1215:
90890-85505
11. Install:
Kickstarter crank 1
Nut (kickstarter crank) 2
NOTE:
Install the kickstarter crank so that there is 5 ~
10 mm (0.2 ~ 0.4 in) a between the kickstarter
crank and the right crankcase cover.
4 - 48
ENG
10 Nm (1.0 m · kg, 7.2 ft · lb)
®
(Yamaha bond No.
®
:
50 Nm (5.0 m · kg, 36 ft · lb)
New

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis