Herunterladen Inhalt Inhalt Diese Seite drucken

Adding Nails; Functions; Stapling & Nailing - Parkside PAT 4 C3 Originalbetriebsanleitung

Vorschau ausblenden Andere Handbücher für PAT 4 C3:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 1

Adding Nails

Set the On / Off switch
the product.
Turn the product over.
Squeeze the release button
Pull back on the pusher
Follow icon shown on pusher
magazine
4
After adding nails, slide the pusher
is fully closed, (see Fig B).
4
Release the release button
the magazine
Note: Use the window on the fill indicator
magazine
4

Functions

Stapling & Nailing
Set the On / Off switch
Press the safety contact
Squeeze the trigger
piece to drive a staple / nail into it.
Set the On / Off switch
product off.
Note: Hold tool firmly and press on work surface before firing to
ensure the complete penetration of the staple / nail.
Clearing Jammed Staples
It may otherwise accidentally be triggered after removing the staple.
Note: Set the On / Off switch
jammed staple.
42 GB/IE
to the "0" position before working on
8
3a
(see Fig. A)
3
3
(see Fig. C)
. It must click and lock into place for
3a
to be closed correctly.
4
is empty.
to the "I" position to switch the product on.
8
into the work piece.
6
whilst holding the product against the work
1
to the "0" position to switch the
8
If a staple is jammed, do not squeeze the trigger
to "0" position prior to clearing the
8
(see Fig. A).
(see Fig. C) and add nails to the
in again until the magazine
3
to see if the
5
.
1

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis