Herunterladen Inhalt Inhalt Diese Seite drucken

Electrical Connection On Finished Walls; Connecting A Load-Shedding Relay - STIEBEL ELTRON DHE Touch 18/21/24 Bedienung Und Installation

Vorschau ausblenden Andere Handbücher für DHE Touch 18/21/24:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

INSTALLATION
Installation options
f Reposition the mains terminal further downwards. To do this,
f
undo the fixing screw. Secure the mains terminal in place.

13.3 Electrical connection on finished walls

Note
This type of connection changes the IP rating of the ap-
pliance.
f Change the type plate. Cross out "IP 25" and mark
f
the box "IP 24". Use a ballpoint pen to do this.
30
1 Cable grommet
f Prepare the power cable. Fit the cable grommet.
f
Material losses
!
Use a new back panel or appliance cover if you break
out the wrong hole in the back panel or appliance cover
by mistake.
www.stiebel-eltron.com 
160
1
f Cleanly cut and break out the required cable entries in the
f
back panel and appliance cover (for the positions, see chap-
ter "Specification / Dimensions and connections"). Deburr any
sharp edges with a file.
f Route the power cable through the cable grommet.
f
f Connect the power cable to the mains terminal.
f

13.4 Connecting a load-shedding relay

Install a load-shedding relay in the distribution board in conjunc-
tion with other electric appliances, e.g. electric storage heaters.
The relay responds when the instantaneous water heater starts.
Material losses
!
Connect the phase that switches the load-shedding relay
to the indicated terminal of the mains terminal in the
appliance (see chapter "Specification / Wiring diagram").
13.5 Internal anti-scalding protection
CAUTION Burns
If operating with preheated water, the set temperature
limit and internal anti-scalding protection may be in-
effective.
In this case, limit the temperature with an upstream cen-
tral thermostatic valve.
DHE Connect | DHE Touch  |
91

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis