Herunterladen Inhalt Inhalt Diese Seite drucken

Intended Use; Device Installation Room; Electrical Installation; Requirements For The Heating Water - Daikin Altherma EHSX04P50D Installations- Und Wartungsanleitung

Integrated solar unit
Vorschau ausblenden Andere Handbücher für Altherma EHSX04P50D:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 67
1
General safety precautions
▪ When carrying out any work on the system, switch off the main
switch and secure against being switched on inadvertently.
▪ Seals must not be damaged or removed.
▪ Make sure that the safety valves comply with the requirements of
EN 12828 when connecting on the heating side, and with the re-
quirements of EN 12897 when connecting on the domestic water
side.
1.2.2

Intended use

The Daikin Altherma EHS(X/H) may only be used for the preparation
of hot water, as a room heating system and, depending on its
design, as a room cooling system.
The Daikin Altherma EHS(X/H) must be installed, connected and op-
erated only according to the indications in this manual.
Only the use of a suitable outdoor unit approved by the manufacturer
is permitted.
ERGA04DAV3
ERGA06DAV3
ERGA08DAV3
ERGA04DAV3A
ERGA06DAV3A
ERGA08DAV3A
Tab. 1-3
Permissible combinations
Any other use outside the intended use is considered as improper.
The operator alone shall bear responsibility for any resulting dam-
age.
Intended use also includes compliance with the maintenance and in-
spection conditions. Replacement parts must at least satisfy the
technical requirements defined by the manufacturer. This is the
case, for example, with original spare parts.
1.2.3

Device installation room

WARNING
The plastic wall of the storage tank of the Daikin Altherma
EHS(X/H) can melt under the effects of external heat
(>80 °C) and, in the extreme case, can catch fire.
▪ Only install the Daikin Altherma EHS(X/H) at a minimum
distance of 1 m to other heat sources (> 80 °C) (e.g.
electrical heater, gas heater, chimney) and combustible
materials.
Installation and maintenance instructions
4
Daikin Altherma EHS(X/H)
EHSX04P30D
EHSX08P30D
EHSX04P50D
EHSX08P50D
EHSXB04P30D
EHSXB08P30D
EHSXB04P50D
EHSXB08P50D
EHSH04P30D
EHSH08P30D
EHSHB04P30D
EHSH08P50D
EHSHB08P30D
EHSHB08P50D
P
-
-
P
-
P
P
-
-
P
-
P
CAUTION
▪ Only install the Daikin Altherma EHS(X/H) if sufficient
load-carrying capacity of the ground of 1050 kg/m
safety margin is ensured. The ground must be flat, hori-
zontal and level.
▪ Outdoor installation is not permissible.
▪ Installation in an explosion-risk environment is not per-
missible.
▪ The electronic control system must not be exposed to
whether effects like rain and snow under any circum-
stances.
▪ The storage tank may not be exposed to continuous dir-
ect sunlight, as the UV radiation and the effects of the
weather will damage the plastic.
▪ The Daikin Altherma EHS(X/H) must be installed protec-
ted from frost.
▪ Make sure that the supply company does not provide
corrosive domestic water. Suitable water treatment may
be required.
▪ Always ensure the minimum distances to walls and other objects
(
Chap.
4.1).
▪ Observe the special installation requirements of the R32 refriger-
ant (see
Chap.
4.3.1).
CAUTION
If a DrainBack solar heating system is connected:
Install the Daikin Altherma EHS(X/H) far enough under
the solar panels to allow complete emptying of the solar
heating system. (Follow instructions in the DrainBack
solar heating system manual). An insufficient height dif-
ference may lead to the destruction of the DrainBack
solar heating system.
▪ The Daikin Altherma EHS(X/H) must not be operated in
rooms with ambient temperatures above 40 °C.
1.2.4

Electrical installation

▪ Electrical installations may only be carried out by electrical techni-
cians and in compliance with valid electrical guidelines as well as
the specifications of the responsible energy supply company.
▪ Compare the mains voltage (230 V, 50 Hz) indicated on the name-
plate with the supply voltage before connecting to the mains.
▪ Before beginning work on live parts, disconnect them from the
power supply (switch off main switch, remove fuse) and secure
against unintentional restart.
▪ Device covers and service panels must be replaced as soon as
the work is completed.
1.2.5

Requirements for the heating water

Avoid damage caused by deposits and corrosion: Comply with the
applicable engineering regulations on prevention of corrosion
products and deposits (VDI 2035, BDH/ZVSHK technical information
"Scale formation").
Minimum requirements regarding the quality of filling and supple-
mentary water:
▪ Water hardness (calcium and magnesium, calculated as calcium
carbonate): ≤ 3 mmol/l
▪ Conductivity: ≤ 1500 (ideal: ≤ 100) μS/cm
▪ Chloride: ≤ 250 mg/l
▪ Sulphate: ≤ 250 mg/l
▪ pH-values (heating water): 6.5 - 8.5
2
plus
Daikin Altherma EHS(X/H)
Daikin Altherma integrated solar unit
008.1444099_00 – 07/2018 – EN

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis