Set-up and installation
The installation site of the Daikin Altherma EHS(X/H) must meet the
minimum requirements below (see
Installation area
▪ The base must be level and smooth and have a sufficient ground
load-bearing capacity of 1050 kg/m² plus safety factor. Install a
pedestal if necessary.
▪ Observe the installation dimensions (see
Minimum distance
DANGER: RISK OF BURNING
The plastic wall of the storage tank of the Daikin Altherma
EHS(X/H) can melt under the effects of external heat
(>80 °C) and, in the extreme case, can catch fire.
▪ Only install the Daikin Altherma EHS(X/H) with a min-
imum distance of 1 m to other heat sources (>80 °C)
(e.g. electrical heater, oil heater, chimney) and the ma-
terial to be combusted.
CAUTION
If the Daikin Altherma EHS(X/H) is not installed a
sufficient distance below the flat solar panels (the top
edge of the storage tank is higher than the bottom edge of
the solar panels), the unpressurised solar system in the
outdoor area will not be able to drain completely.
▪ When a solar connection is used, install the Daikin
Altherma EHS(X/H) low enough at the flat solar panels
(observe minimum gradient in the solar connection
lines).
Recommended minimum distances:
To the wall: (back) ≥ 100 mm, (sides) ≥ 500 mm
To the ceiling: ≥ 1200 mm, at least 480 mm.
4.3.2

Installing the device

WARNING
The Daikin Altherma EHS(X/H) is top-heavy in the unfilled
state and could tip over during transport. That could put
persons in danger or damage the unit.
▪ Secure the Daikin Altherma EHS(X/H) well, transport
carefully, use handles.
Precondition
▪ The installation site complies with applicable country-specific reg-
ulations and meets the minimum requirements described in
4.3.1.
Installation and maintenance instructions
14
also Chap.
1.2.3).
Chap.
4.1).
Chap.
Installation
Fig. 4-6
Installing the handles
Item
Designation
A
Handle
B
cover panel
F
Threaded piece
Tab. 4-3
1
Remove packing and dispose of it in an environment-friendly
manner.
2
Pull off the cover screens from the storage tank
and unscrew the threaded fittings
openings at which the handles are to be fitted.
3
Screw the handles
(Fig.
4-6, item A) into the now uncovered
threaded holes.
4
Carefully transport the Daikin Altherma EHS(X/H) to the installa-
tion site, use the handles.
(Fig.
4-6, item B)
(Fig.
4-6, item F) from the
Daikin Altherma EHS(X/H)
Daikin Altherma integrated solar unit