Herunterladen Inhalt Inhalt Diese Seite drucken

Mount The Sharpener; Operation; Switching On And Off - Parkside PSS 65 A1 Betriebsanleitung

Vorschau ausblenden Andere Handbücher für PSS 65 A1:
Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mount the sharpener

1. Select one of the three sharpe-
ners.
2. In order to remove a sharpener
from the working position, you
must press down the release le-
ver for the sharpener (13).
3. Remove the sharpener from the
guide rails, upwards.
4. In the storage positions, the shar-
peners are not fixed to the right
and left side and can be easily
removed from the guide rails.
5. In order to fasten the selected
sharpener in the working positi-
on, from above push this into the
guide rails. Press the sharpener
down until it snaps into place.
The sharpeners also present
a safety device. Never use
this device without a sharpe-
ner. Risk of injury!

Operation

Caution! Risk of injury!
- Always disconnect the plug from
the mains socket before working.
- Use only grinding disks and acces-
sories recommended by the manu-
facturer. The use of other insertion
tools and other accessories may
cause risk of injury.
- Never operate the device without
the visual protection disk.
-
Switch on the equipment only when
it is safely installed on the work sur-
face.
Despite spark protection, al-
ways wear safety goggles
while working in order to
avoid eye injuries.
Keep your hands away from
the grinding disc and grind-
ing belt when the device is in
operation. Injury hazard!.

Switching on and off

Ensure that the mains voltage
matches the specifications on the
rating plate.
Connect the equipment to the mains.
1. To switch on, press the "I" On switch
and the device starts up (see
2. To switch off, press the "0" off switch
and the device switches off (see
After switching on the device, wait until the
device has reached its max. speed. Only
then must you start with the grinding.
The disk will continue to
run after the equipment is
switched off. There is a risk
of injury.
Test run:
Before starting work and after each
change of grinding disk, carry out a test
run of at least 60 seconds with no load.
Switch off the equipment immediately if the
disk runs lumpy, substantial vibrations oc-
cur, or abnormal noises are generated.
GB
3).
3).
25

Quicklinks ausblenden:

Werbung

Kapitel

Inhaltsverzeichnis
loading

Inhaltsverzeichnis