Herunterladen Inhalt Inhalt Diese Seite drucken

Installation; Operation - Quick MILL 4100 Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Mod. 04100
The packaging contains loose parts and accompanying
documentation which is to be kept for further
consultation.
Open the upper part of the package, remove the
accessories and then slip the machine from the
wrapper.
Check the integrity of the machine, the accessories,
the power supply cable and plug, and in the event
of damage contact the retailer immediately.
The
packaging
polystyrene, nails, cardboard, etc.) must not be
left within the reach of children as they are a
potential sources of danger.
Avoid release to the environment. Dispose of them at a
local waste disposal company.

8. INSTALLATION

The machine is shipped ready for installation in
accordance with the data found rating plate.
Ensure that the machine specifications comply with
those of the local electrical power supply.
The electrical system must be equipped with an
efficient residual current device or an automatic circuit
breaker with an efficient earthing system. In the event
no electrical safety device is present, have a qualified
technician install a two pole rocker switch/thermal-
magnetic circuit breaker as required by current safety
regulations.
Proper earthing of the device is mandatory.
The manufacturer declines all responsibility
in the event this health and safety regulation
is not respected.
Be careful not to damage the power supply cable by
bending, crushing or stresses.
Do not disconnect the power supply to the machine by
pulling on the cable. Disconnect by handling the plug.
To avoid difficulty regarding operation, supply or
maintenance, do not position the machine in tight
spaces.
The surface where the machine is to be installed
must be level, dry, durable and stable, and at a
height of 80 cm from ground.
Position the machine and connect the power
supply cable to the electrical socket.
8.1. Control descriptions
Main switch.
5. Main switch
Setting the switch to position 1, the machine is now
ready to load the boiler; position 2 boiler heater and
the green light 5 is lit. Always begin by turning the
switch to position 1, and ensure there is water in the
material
(plastic
bags,
boiler by activating the pump (load heater or coffee)
before moving the switch to Pos. 2.
6. Coffee delivery switch.
Press the button to deliver coffee from the group.
7. Hot water delivery/load boiler switch.
Press the button, with the steam tap in the open
position, to deliver hot water, as shown by the lit
orange indicator light 7.
8. Vapour delivery switch.
Actuating the steam delivery button, the machine is
ready for the delivery of steam.
NB. The two switches, 3 and 4, are used separately (the
delivery of water may not be performed at the same
time as the delivery of steam or vice versa).
6. Boiler heat resistance indicator light;
It lights when the electric resistance element which
heats the water in the boiler is operating.
7. Boiler full/hot water delivery indicator light.
9. Vapour delivery/hot water knob.
Turn the knob in an anti-clockwise direction to
deliver hot water or steam.

9. OPERATION

9.1 Filling with water
Fill the water reservoir (use drinking water only,
softened if possible).
The machine may be equipped with a resin water
scale filter. Before switching on the machine, let
the filter soak in water to impregnate the resins
(operation to be carried out the first time, after a
long period when the machine is not in use, when
the reservoir has been totally emptied or the filter
is replaced).
Insert the reservoir, making sure that the rubber
dip tube is not crimped or bent.
Remove the filter holder and open the steam tap,
then turn the main switch to position 1 and actuate
the deliver coffee switch 2, until water exits from
the spout.
When water exits from the vapour tube, close the
tap and let water from the group flow for a few
seconds, after which close the hot water switch. If,
after 30 seconds, no water exits, repeat the
operation.
Once the boiler is full, turn switch 1 to position 2 to
activate the heater.
Attach the filter holder 13 with the filter inserted
and wait for the machine to heat up and reach
operating temperature.
9.2 Bringing the machine up to operating temperature
Check the level of water in the reservoir.
Rev.00

Quicklinks ausblenden:

Werbung

Inhaltsverzeichnis
loading

Inhaltsverzeichnis