Herunterladen Diese Seite drucken

ProPlus 345007 Gebrauchsanweisung Seite 3

Flaschenzug mit 20m nylonseil
Verfügbare Sprachen

Verfügbare Sprachen

@ Pulley
With 20M nylon rope
Putting into operation:
• Before putting the cable hoist into operation, read the operating hstructions carefully.
• Observe all safety and operating information.
• Only correct handling and maintenance will ensure that the appliance gives long and
reliable
service.
• Use only original spare parts for repairs.
• DOnot alter the appliance in any way, as this may invalidate the guarantee, impair safety
and cause serious accidents.
• The cablehoist must be put into operationby competent
Assembly Of the hoist at the site:
• Attach the frame (a) to the suspension device with the 4 rollers and towing
rope (b) (Fig. l).
• Connect the terminal (c) to the load to be hoisted with the 3 rollers and the knotted
end Of the rope (d) (Fig, 1).
CAUTION! A special, self-securing knot is made in the knotted end Of the
rope (d). Only a specialist may undo and remake this knot (Fig. 2). Danger Of
injury to individuals and Of property damage by improper knotting!
Safety and operating information:
• Do not use to hoist hazardous goods, people or animals.
• Donot useas a plaything(e.g.as a swing).
• Hoisting loads exceeding the maximum load capacity can result in material darnage and
personal injury.
• The suspension for thehoistinggearmustbe ableto beara loadhigherthan the
maximum loadbearing capacity of the hoisting gear.
Do not use more than one set of hoisting gear to hoist a load.
Sling the cable around the load so that it cannot slip or work loose.
Donotenterthe dangerzonewhilethe hoistinggearis underload.
Never walk or stand under the load while it is beng hoisted.
Makesurethat you lowerand placethe loadon a firm.level s urface.
Do not allow the cable to run out completely.
Never pull loads and cables over sharp edges and corners, as this may cause the cable
to break.
Protect the hoisting gear from dirt and weather.
Maintain the hoisting gear regulary; keep cable and pulleys clean; oil the pulley axles.
Check the cable and all parts of the hoisting gear for damage regularly and always before
• Replace darnaged or worn cable hoist immediately.
Never r epair o r maintain thehoisting gearwhileit {sloaded.
• Always wear a safety helmet, safety goggles and work gloves when working with the
cable hoist.
Max. capacity:
Length:
Diameter:
180KG
1180daN
20M
Ø4mm
USER MANUAL
hoist
Art nr. 345007
only.
Fig.l
a
b
max.
c
max.
180 kg
Fig.2
2)
1)
3)
20 m
c€e)0é
PATEurope BV
BC Oudkarspel
The
loading