Herunterladen Inhalt Inhalt Diese Seite drucken

Installing The Reserve Parachute - Advance Protect Ii Ris Betriebshandbuch

Inhaltsverzeichnis
Verfügbare Sprachen

Verfügbare Sprachen

Installing the Reserve Parachute

PROTECT reserves are certified for all harnesses (see chapter
<Certification>). If the reserve is to be fitted into a harness outer con-
tainer all the installation parts should be carefully inspected by the
packer. The reserve must be attached to the harness by connecting
the harness bridle to the reserve bridle by means of a suitable screw
link (Maillon Rapide 7mm). The bridle ends should be stabilised at
each end of the maillon by O-rings. (Pic: Connection)
Note: Don't use sticky tape instead of O-rings.
44
Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Protect nano

Inhaltsverzeichnis