Herunterladen Inhalt Inhalt Diese Seite drucken

Panasonic KH-B90FBC1 Bedienungsanleitung Seite 21

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 22
sive tape. The adhesive tape must be strong enough to bear the weight of the chimney (D),
and must be adhered well in four sides.
2) Fasten the chimney-extension assembly (D+E) to the trellis (C) using 4 M4 metric screws
(V3) inserted in the existing holes without locking them permanently.
(Fig. B2) Version with false ceiling
1) for false ceilings, fasten the extension support components (A) to the trellis (C) using the
provided 4 screws (V3).
2) In the event the trellis (C) and the extension (D) are not used (very low ceilings and only suc-
tion version as recirculation slots of the extension are not provided), fasten the extension
support elements (A) to the trellis (C1) using the 4 screws (V3).
3) Insert the chimney (D) onto the extension (E) and fasten them together with the adhesive
tape. The adhesive tape must be strong enough to bear the weight of the chimney (D), and
must be adhered well in four sides.
4) Introduce the chimney-extension assembly (D+E) into the trellis (C).
- Fasten the chimney-extension set (D+E) to the extension support elements (A) or onto the
top trellis C1 with the 4 screws (V3) without screwing them all the way.
(Fig. B3)
1) In case of suction version: install the return valve ( M) and the pipe fi tting (N) as described in
Fig. H2 and H3. Detect the optimal height of the rigid or fl exible fume discharge pipe (F) and
connect it to the motor fi tting.
Phase 3
(Fig. C1)
1) Remove the perimeter suction panel and metallic fi lters as described in sec. H.
2) Lift the cooker hood connecting it to the 4 M5 metric screws (V4) pre-tightened to the trellis
(C)
3) Centre the Ø11mm holes on the slot of the interchamber and move it sideways.
4) Fasten the 4 M5 screws permanently (V4).
(Fig. D1)
1) Remove the adhesive tape.
2) Remove the 4 M4 metric screws (V3) previously tightened to the trellis.
3) Make the chimney-extension assembly slide downwards.
4) Connect the tube to the discharge hole of the ceiling (in case of suction version).
5) Carry out electric connection only after having disconnected the electric power supply
complying with the standards in force (sec. D).
6) Make the chimney-extension assembly slide upwards.
7) Fasten the extension to the trellis (C) using the 4 M4 metric screws (V3).
8) Lock the chimney using 2 self-threaded screws (V5)
- Reassemble the perimeter suction panel and metallic fi lters as described in sec. H.
- Power the hood complying with the regulations in force (see sec. D of the booklet).
19

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Kh-b90fbw1

Inhaltsverzeichnis