Herunterladen Inhalt Inhalt Diese Seite drucken

Structure And Function Of The Turbo Inverter; Casing; Operating Buttons - Solar Frontier PowerSet Turbo Installations- Und Bedienungsanleitung

Inhaltsverzeichnis

Werbung

Verfügbare Sprachen

Verfügbare Sprachen

Disconnecting DC connections from the inverter
Disconnect DC cables according to the manufacturer's instructions. A special
tool is required for this.
Warning
DC cables are under current if light falls on the modules.
Disconnecting the AC plug from the inverter
For the Turbo 1P Mini / 1P inverter:
1. Remove the AC plug from the socket on the inverter as described in chapter 13.1.
2. Check that all pins of the AC plug are free of voltage. Use a suitable voltmeter for
this (do not use a simple neon phase checker).
For the Turbo 3P1 / 3P2 inverter:
1. Disconnect the AC plug from the inverter: gently press in the ratchet near the
front of the AC plug with a suitable object to unlock it, and remove the plug.
2. Check that all pins of the AC plug are free of voltage. Use a suitable voltmeter for
this (do not use a simple neon phase checker).
Opening the AC plug (only if required)
For the Turbo 1P Mini / 1P inverter:
Open the AC plug as described in the Appendix under Mounting > AC plugs.
For the Turbo 3P1 / 3P2 inverter:
Open the AC plug: First open the cable gland at the back and then push in the
ratchets on the left and right of the plug casing (simultaneously) and unlock
with a suitable tool. Then remove the upper part of the casing from the con-
tact part.
Removing the inverter from the mounting plate
1. Use one hand to press the retaining plate on the mounting plate approx.
5 mm (0.20 in) towards the mounting surface
2. Use the other hand to push the inverter upwards, far enough so that the
retaining plate no longer latches.
3. Lift the inverter with both hands until the hooks on the rear side of the inverter
are free
3
4. Remove the inverter from the mounting surface
4
3
2
(Figure 30).
1
Release the retaining plate.
2
4
1
Figure 30
6.

Structure and function of the Turbo inverter

6.1

Casing

1
Hood
2
Display (monochrome, 128 x 64 pixels)
3
Type plate, Serial number, warning notices
4
Operating buttons: ESC,
5
1x AC connector
6
1x DC connector plus (+) for solar modules
(Phoenix Contact SunClix, insulated)
7
1x DC connector minus (−) for solar modules
(Phoenix Contact SunClix, insulated)
8
DC circuit breaker
(interrupts plus and minus inputs simultaneously)
9
2x RJ45 sockets (RS485 bus)
10
1x RJ45 socket (Ethernet)
11
1x RJ10-socket (Modbus RTU)
The casing components are described in detail below.

6.2 Operating buttons

The operating buttons (
in Figure 31) have the following functions:
4
Button
Action
Function general
jumps up by 1 menu level
Press
briefly
ESC
Press longer
jumps to status display
(≥ 1 second)
• moves the highlighted bar or the content of the
display up
Press
• moves the highlighted position in a numerical setting
briefly
one digit to the left
• increases a setting by one step
• moves the highlighted bar or the content of the
display down
Press
• moves the highlighted position in a numerical setting
briefly
one digit to the right
• decreases a setting by one step
jumps down 1 menu level
Press
• a selected numerical value begins to flash and can be
briefly
altered
SET
• adopts any changes
• alters the state of a control (checkbox/radio button)
Press longer
(≥ 1 second)
answers a query dialogue with yes navigates 1 step forward
12
Figure
,
, SET (from left to right)
Guided configuration
navigates 1 step
discards any changes
jumps to the start of the
guided configuration process
31
Table 1

Werbung

Inhaltsverzeichnis
loading

Diese Anleitung auch für:

Powerset mini

Inhaltsverzeichnis