Herunterladen Inhalt Inhalt Diese Seite drucken

Pfannenberg Rack Serie Bedienungsanleitung Seite 15

Inhaltsverzeichnis
Verfügbare Sprachen
  • DE

Verfügbare Sprachen

  • DEUTSCH, seite 34
Fill reservoir with water-glycol mixture until the maximum level is reached. (water quality and treatment should be established
according to the application specifications)
Connect water inlet and outlet pipes and make a visual inspection.
Establish main power feed and alarm cable with customer's equipment.
CHILLER with pump: Purge pumps by loosening purging screw that is located on the side of pump. Be advised that the pump
has been purged correctly when only water is visible.
70040-071_01-F_(Op._Manual_EN-DE-ES-FR-IT-RU)
English
Picture 11 / 12 – Filling process and max level
Picture 13 – Pipe connection
Picture 14 – Electrical connections
15
Inhaltsverzeichnis
loading

Inhaltsverzeichnis